Change quote feed
This guide will show you how to fetch the latest feed values for two feeds and convert them to a new quote feed while retaining the number of decimals.
For example, if you need the price of BTC/ETH, you can fetch the latest feed values for BTC/USD and ETH/USD and calculate the price of BTC/ETH = (BTC/USD) / (ETH/USD).
// SPDX-License-Identifier: MIT
pragma solidity >=0.8.0 <0.9.0;
import {ContractRegistry} from "@flarenetwork/flare-periphery-contracts/coston2/ContractRegistry.sol";
/* THIS IS A TEST IMPORT, in production use: import {FtsoV2Interface} from "@flarenetwork/flare-periphery-contracts/coston2/FtsoV2Interface.sol"; */
import {TestFtsoV2Interface} from "@flarenetwork/flare-periphery-contracts/coston2/TestFtsoV2Interface.sol";
/**
* THIS IS AN EXAMPLE CONTRACT.
* DO NOT USE THIS CODE IN PRODUCTION.
*/
contract FtsoV2ChangeQuoteFeed {
/**
* @dev Internal function to scale the base feed value to match the decimals of the final feed.
*/
function _scaleBaseFeedValue(
uint256 _baseFeedValue,
uint8 _baseFeedDecimals,
uint8 _finalDecimals
) internal pure returns (uint256) {
if (_baseFeedDecimals < _finalDecimals) {
// Scale up if base feed decimals are less than final feed decimals
return
_baseFeedValue *
10 ** uint256(_finalDecimals - _baseFeedDecimals);
} else if (_baseFeedDecimals > _finalDecimals) {
// Scale down if base feed decimals are more than final feed decimals
return
_baseFeedValue /
10 ** uint256(_baseFeedDecimals - _finalDecimals);
} else {
// No scaling needed if decimals are equal
return _baseFeedValue;
}
}
/**
* @dev Function to compute the new quote feed value based on the base and quote feed values.
* @param _baseAndQuoteFeedIds Array containing the IDs of the base and quote feeds.
* @return The computed new quote feed value in the original quote decimals.
*/
function getNewQuoteFeedValue(
bytes21[] calldata _baseAndQuoteFeedIds
) external view returns (uint256) {
require(
_baseAndQuoteFeedIds.length == 2,
"Invalid feed indexes. Please provide exactly two indexes."
);
/* THIS IS A TEST METHOD, in production use: ftsoV2 = ContractRegistry.getFtsoV2(); */
TestFtsoV2Interface ftsoV2 = ContractRegistry.getTestFtsoV2();
// Fetch current feeds
(uint256[] memory feedValues, int8[] memory decimals, ) = ftsoV2
.getFeedsById(_baseAndQuoteFeedIds);
// The base feed gets scaled by:
// - comparison with the quote feed
// - being returned in the quote feed decimals
uint8 finalDecimals = 2 * uint8(decimals[1]);
// Scale the base feed value to match the final feed decimals
// Scaling is done all at once for smaller calculation errors
uint256 scaledBaseFeedValue = _scaleBaseFeedValue(
feedValues[0],
uint8(decimals[0]),
finalDecimals
);
// Prevent division by zero
require(feedValues[1] != 0, "Division by zero");
// Compute the new quote feed value
uint256 newQuoteFeedValue = scaledBaseFeedValue / feedValues[1];
return newQuoteFeedValue;
}
/**
* @dev Function to compute the new quote feed value based on the base and quote feed values.
* @param _baseAndQuoteFeedIds Array containing the IDs of the base and quote feeds.
* @param _newQuoteDecimals Number of decimals for the returned value.
* @return The computed new quote feed value in the parameter decimals.
*/
function getNewQuoteFeedValueSetDecimals(
bytes21[] calldata _baseAndQuoteFeedIds,
uint8 _newQuoteDecimals
) public view returns (uint256) {
require(
_baseAndQuoteFeedIds.length == 2,
"Invalid feed indexes. Please provide exactly two indexes."
);
/* THIS IS A TEST METHOD, in production use: ftsoV2 = ContractRegistry.getFtsoV2(); */
TestFtsoV2Interface ftsoV2 = ContractRegistry.getTestFtsoV2();
// Fetch current feeds
(uint256[] memory feedValues, int8[] memory decimals, ) = ftsoV2
.getFeedsById(_baseAndQuoteFeedIds);
// The base feed gets scaled by:
// - comparison with the quote feed
// - being returned in the "_newQuoteDecimals" decimals
uint8 finalDecimals = uint8(decimals[1]) + _newQuoteDecimals;
// Scale the base feed value to match the final feed decimals
// Scaling is done all at once for smaller calculation errors
uint256 scaledBaseFeedValue = _scaleBaseFeedValue(
feedValues[0],
uint8(decimals[0]),
finalDecimals
);
// Prevent division by zero
require(feedValues[1] != 0, "Division by zero");
// Compute the new quote feed value
uint256 newQuoteFeedValue = scaledBaseFeedValue / feedValues[1];
return newQuoteFeedValue;
}
/**
* @dev Function to compute the new quote feed value based on the base and quote feed values.
* @param _baseAndQuoteFeedIds Array containing the IDs of the base and quote feeds.
* @return The computed new quote feed value in wei (with 18 decimals).
*/
function getNewQuoteFeedValueInWei(
bytes21[] calldata _baseAndQuoteFeedIds
) external view returns (uint256) {
uint256 newQuoteFeedValue = getNewQuoteFeedValueSetDecimals(
_baseAndQuoteFeedIds,
18
);
return newQuoteFeedValue;
}
}
The TestFtsoV2Interface is for testing only, with all methods as view to allow rapid development without gas costs or state changes. For production, use FtsoV2Interface, which includes payable methods required for real transactions and state modifications.
Make the following changes to FtsoV2ChangeQuoteFeed.sol:
import {ContractRegistry} from "@flarenetwork/flare-periphery-contracts/coston2/ContractRegistry.sol";
import {FtsoV2Interface} from "@flarenetwork/flare-periphery-contracts/coston2/FtsoV2Interface.sol";
contract FtsoV2ChangeQuoteFeed {
FtsoV2Interface internal ftsoV2;
constructor() {
ftsoV2 = ContractRegistry.getFtsoV2();
}
//...
}
-
Using Remix: Set EVM version to
cancunin the Advanced Configurations section of the Solidity Compiler tab:
-
Using Hardhat or Foundry: Set EVM version to
cancunin hardhat.config.ts or foundry.toml. -
Using Standard Solidity JSON: Set
evmVersiontocancun:{
"settings": {
"optimizer": {
/* ... */
},
"evmVersion": "cancun"
}
} -
Using
solcCLI: Set--evm-versiontocancun:solc --evm-version cancun <args>